Phase One: Mitigation
The first phase stops the spread: source shut-off, water removal, wet pad removal and drying setup. It is billed separately from reconstruction on most claims.
- Category 1, 2 and 3 assessment
- Class 1 to 4 drying load
- Controlled demolition



